If I have 139 Smart Matches, I work through the first 50. As I make any changes (copy over a DOB for instance) and then save and go on to the next person, person just worked on has changed places within the 50. By the time I have worked through the 50 they are in all kinds of different order from what started. Thusly I have to go look through the whole 50 again to see what I missed. If they would stay in line it would save bookoo hours of time. Then perhaps as I go into the 2nd 50, someone from 1st batch has jumped over into the 2nd batch of 50. Also, within that 139, maybe 6 are rejects. I would then like to be able to go to the top and have a button to Accept All, that would not include the 6 rejects that I have already clicked as rejects. As it stands now, in this scenario, I have to go through each and every one of the Accepts one by one. Very time consuming..
I agree also. As it is now I have to go thru all matches and make all rejects or accepts and then press accept all/reject all. If the links accept all/reject all where applicable just for the present page it would be usefull but not as it is now. And why not a selection box where I can select some matches and then Accept or Reject the selection.